General
- CA-VE-12T breaker switchgear has following features:
Easily to install
Less maintenance
Long service Life
Size small
A real buy
-
It conforms to the relative requirement of “GB1984-89, GB/ T1984-2003 High-voltage alternating-current circuit-breakers”.
Main Loop: 630A-20kA(4s)、25kA(3s)
Mechanical life: 10000 times.
Ground Loop: 20kA(2s)
Mechanical life: 10000 times
Environmental conditions and attention
-
The altitude should not exceed 2000m and seismic intensity should not exceed 8 degrees.
-
Anti-pollution class: II
-
Ambient air temperature should not be higher than 140 Celsius degrees and should not be lower than forty below zero. The daily average differences between day and night temperatures should not be higher than 95% and monthly average should not be high than 90%.
-
The operating mechanism should not be installed in the places as below:
The places with frequent violent vibration
The places with great vapor、gas、chemical corrosive deposition、salt mist and dust.
The place where it is easily inflammable and explosive.
Specifications
Main technical specification
Item | content | Unit | technical specification |
1 | Main circuit resistance of circuit breaker | UO | ≤30 |
2 | Overrun | mm | 2-3 |
3 | Contact Gap | mm | 8-10 |
4 | bouncing | ms | ≤2 |
5 | Average speed of switch opening | m/s | 0.6-1.4 |
6 | Average speed of switch closing | m/s | 0.4-1.1 |
7 | Three-phase non-synchronous opening | ms | ≤2 |
8 | Three-phase non-synchronous Closing | ms | ≤2 |
Order Number
Download
GIS Disconnector Switch
As the main components of the Gas Insulated switchgear , bear the main function, has the performance of dividing and closing the rated current, load current; closing and opening the circuit breaker, grounding, etc.
GIS Operating mechanisms for
Disconnector switch
GIS Operating mechanisms for Disconnector switch is the main components of GIS, it it impossible to remove the cable compartment covers with the earthing switch in open postion. It will then also be impossible to operate the load break/disconnector switch to open position before the cable compartment cover is mounted properly.